Track Update – October 2, 2015
Over the next few weeks the circuit will take on its permanent appearance. Tilke Engineering’s design requires that the grading and leveling is referenced at least every metre and compared to the design drawings. While time consuming, this attention to detail will result in a perfect track surface.
Superb construction
Track update: Grading is almost complete
It’s clear to see what Tilke GMBH & Co had in mind when they designed the circuit. Forms to create the curbing will begin to be placed within the next week. The track will then receive a light “crush” topping (a light aggregate) prior to final grading.
Tracking Success and Building a Legacy Together
Recognized within the industry, Erb has served as Provincial President of the Canadian Home Builders Association (CHBA-BC), and as President of the Vancouver Island Construction Association (VICA).